• Skip to main content
  • Skip to footer

Steve Hoeck Construction, Inc.

Old World Craftmanship in a Contemporary World

  • Home
  • About
  • Our Work
  • Contact

FPT Machine Foundation

FPT Machine Foundation required cutting the existing factory concrete floor and digging it out to an 8 foot depth and 6 stages of concrete pours for a foundation 50 feet by 30 feet and 3 miles of rebar.

ALL
  • ALL

Footer

Ready to Get Started?

CONTACT US TODAY
© 2026 Steve Hoeck Construction, Inc. | Privacy Policy | Website By Type B Studio